PE / Investor Pre-Equity Due Diligence

For a PE fund looking at an unfinished building — say at super-structure stage — who needs fundamental due diligence before committing capital. Covers physical structure assessment, land-ownership and title verification, face-to-face developer interview, and validation of tangible milestones such as signed HMAs with reputable operators. Gives the investor enough confidence to proceed to the financial modelling phase.

FIXED FEE
USD 18,500
flat fee
5 days on-site
18 days total delivery
Commission this stream → Bundle in a package
Commissioned by
Private equity funds, family offices, DFIs, and institutional investors
About the counterparty
Developer, current owner, or JV sponsor seeking equity
Transaction enabled
Equity deployment confidence · IC approval · term-sheet negotiation
QUESTIONS THIS STREAM ANSWERS

Exactly what you'll know afterwards.

?
Is the physical structure sound enough to complete without major rework?
?
Is the land title clean, unencumbered, and correctly registered to the developer?
?
Does the developer have the track record and team to deliver the remaining build?
?
Have the commercial milestones the developer claims (HMA signed, anchor tenants, planning consents) actually been achieved and documented?
?
What are the top 5 structural / legal / commercial risks a PE investor would inherit?
EVERY DELIVERABLE IN THE FEE

What physically arrives at the end.

Every document, file, and output the commissioning stakeholder receives. Each is included in the fixed fee. Every report is signed, sealed, and carries a verification URL any third party can check.

01
70–95 page signed and sealed pre-investment DD report with verification URL
02
Structural condition assessment by chartered surveyor (where stage permits)
03
Land title and encumbrance verification with certified-copy annexures
04
Developer interview transcript and track-record verification
05
Milestone evidence pack — HMAs, consents, contractor certificates, utility connections
06
Red Flag Summary — one-page IC-ready page at the front of the report
07
GO / PROCEED-WITH-CONDITIONS / PAUSE recommendation for investor IC
08
Shortlist of conditions precedent to include in any term sheet
09
Excel annex: capex-to-complete forecast based on observed progress
10
60-minute findings clinic with the investment committee
HOW WE WORK

Methodology, day by day.

Complete transparency on how the mission runs. You know in advance what happens on which day, which systems we touch, and who we interview.

PHASE 01
Pre-mission (Days 1–4)
Review investor mandate + sponsor deck + provided data room
Land registry / ministry-of-lands search for title verification
Public records search: planning approvals, NEMA, DDP consents
Pre-mission question pack issued to the sponsor
PHASE 02
Day 5 — Site + structure
Full site walkthrough with chartered surveyor
Structural condition assessment (foundation, columns, slabs, envelope)
MEP infrastructure assessment (backbone, not fit-out)
Photo-documented work-to-date evidence record
PHASE 03
Day 6 — Developer + team interviews
Developer / principal interview (2 hours, formal)
Project Manager / Engineer interviews
Contractor Foreman interview + delivery-capacity review
Consulting architect / QS interview
PHASE 04
Day 7 — Commercial milestones
HMA / LOI / franchise-agreement review with operator copied
Verification of any anchor-tenant / F&B JV commitments
Planning-consent compliance check with local authority
Utility connections: power letters, water, sewage confirmation
PHASE 05
Day 8 — Site verification + wrap
Independent cross-check of contractor progress claims
Boundary + access verification against title
Sponsor exit meeting with preliminary findings
PHASE 06
Post-mission (Days 9–18)
Integrated report drafting across five work-streams
Preliminary Red Flag call with investor IC (verbal)
Draft → investor comments → final sealed
Findings clinic with IC
WHAT WE CHECK — EVERY ITEM

The complete validation checklist.

This is the working checklist the team carries on-site. Grouped by section, every item is reviewed, scored, and reconciled to evidence in the final report.

Physical structure  (8)
Foundation evidence
Column + slab integrity
Envelope progress
Waterproofing
MEP backbone
Quality of workmanship
Defects register
Snagging trend
Land + title  (7)
Title deed verification
Registered proprietor match
Charges + encumbrances
Boundary pegging
Access easements
Zoning consistency
Covenant restrictions
Developer track record  (6)
Completed projects visited
Team bench depth
Team continuity on this project
Financial footprint
Prior litigation
Reputational references
Commercial milestones  (7)
HMA / franchise status
Anchor-tenant commitments
Planning consents
Building approvals
Environmental clearance
Utility commitment letters
Contractor contracts
Investor risk register  (7)
Structural risks
Title risks
Completion-cost risk
Schedule risk
Operator-fit risk
Regulatory / political risk
Exit liquidity risk