Pre-Opening Commercial Readiness

Commissioned typically 90, 60, or 30 days ahead of commercial opening. Validates every element of the pre-opening plan against the HotelCompass 186-point readiness library. Lenders use it to authorise the final construction drawdown; owners use it to stress-test the opening date commitment.

FIXED FEE
USD 8,500
flat fee
3 days on-site
9 days total delivery
Commission this stream → Bundle in a package
Commissioned by
Owners, lenders, and institutional investors ahead of commercial opening
About the counterparty
Pre-opening operator / management team
Transaction enabled
Opening-date confirmation · ramp-up forecast credibility · final drawdown release
QUESTIONS THIS STREAM ANSWERS

Exactly what you'll know afterwards.

?
Will the property actually open on the committed date to the committed standard?
?
Which pre-opening work-streams are at risk?
?
What escalation is required now to prevent opening-day embarrassment?
?
Is the ramp-up forecast realistic given current pre-opening status?
EVERY DELIVERABLE IN THE FEE

What physically arrives at the end.

Every document, file, and output the commissioning stakeholder receives. Each is included in the fixed fee. Every report is signed, sealed, and carries a verification URL any third party can check.

01
50–70 page readiness audit with traffic-light grading across 186 items
02
Critical-path exception register with owner, deadline, mitigation
03
Recruitment completion audit vs opening staffing guide
04
Licensing + statutory completeness verification
05
Soft-opening programme critique
06
Daily stand-up template for the final 30 days
HOW WE WORK

Methodology, day by day.

Complete transparency on how the mission runs. You know in advance what happens on which day, which systems we touch, and who we interview.

PHASE 01
Pre-mission
Obtain pre-opening plan + staffing log + licensing tracker
Review operator pre-opening standard (if branded)
PHASE 02
Day 1 — Licensing + physical
Statutory licensing verification visit
Physical-product walkthrough + snag-list status
IT + systems readiness (PMS, POS, Wi-Fi, PBX, BMS)
PHASE 03
Day 2 — People + training
Recruitment-completion audit by position
Training-completion audit by curriculum
GM + EXCO interviews
PHASE 04
Day 3 — Marketing + soft-opening + wrap
Sales + marketing readiness (pipeline, channels, collateral)
Soft-opening programme review
Stakeholder wrap-up
PHASE 05
Post-mission
Scoring against 186 standard points
Report + seal
WHAT WE CHECK — EVERY ITEM

The complete validation checklist.

This is the working checklist the team carries on-site. Grouped by section, every item is reviewed, scored, and reconciled to evidence in the final report.

Physical  (6)
FF&E installed
Snag-list progress
External works
Signage
Wayfinding
Landscape
Systems  (6)
PMS configured
POS configured
Wi-Fi live
PBX
BMS
Access-control
People  (6)
GM + EXCO in-seat
Rooms complement
F&B complement
Kitchen complement
Engineering complement
Training % complete
Commercial  (6)
Website live
OTA connectivity
Rate loading
Group pipeline
Corporate contracts
Loyalty integration
Licensing  (6)
Trade licence
Liquor licence
Music licence
Fire safety
Health + sanitation
Tourism-board